CBM Exercises

The exercise included on this page uses EXAKT CBM modeling software. EXAKT is an advanced Living RCM Certified® reliability analysis system that predicts a component’s remaining useful life based on its age and current condition. A maintenance department achieves continuous equipment reliability improvement by capturing and then analyzing accurate history data. The videos illustrate the theory and practice needed for obtaining analyzable event data.  A trial version of EXAKT and sample data can be downloaded from this page.

Living RCM Certified®
Basic problem in physical asset management
The missing link
Need for dynamic RCM updates
The nature of physical asset management data
Failure mode selection
Sample Generation for Reliability Analysis
Analysis and predictive modeling
CBM Automation
CBM model continuous improvement
Sensitivity of CBM ROI to Cost Assumption
Data prep for CBM models of complex items

Downloads

  1. Exakt trial software
  2. Exercise 1 data
  3. Slides
  4. Register

© 2011 – 2019, Murray Wiseman. All rights reserved.

This entry was posted in Exercises and tagged , , , . Bookmark the permalink.
Subscribe
Notify of
4 Comments
Newest
Oldest Most Voted
Inline Feedbacks
View all comments
trackback
8 years ago

[…] Exercise 1 as an example[1], the failure mode to be monitored is “Trans”[2] Say the decision model […]

trackback

[…] Examples of the use of the EXAKT CM decision modeling system are given here. The theory of EXAKT can be found here. […]

trackback

[…] with actual failure events in order to determine its influence on the probability of failure. See example. […]

trackback

[…] such as SPAR PHM, see exercise 10 at https://www.livingreliability.com/en/posts/cbm-exercises/ […]