Category Archives: EAM

Accurate maintenance history reporting

Video transcript Scene 00-1 A systematic process for increasing physical asset reliability eludes many maintenance departments. Scene 00-2 How can we increase equipment reliability? By capturing and then analyzing maintenance and repair history. Reliability improvement depends on your having performed … Continue reading

Posted in CBM, EAM | 1 Comment

You can’t see the title

This content is restricted to site members. If you are an existing user, please login.




Lost Password?
Posted in CBM, EAM, LRCM, RCM, RcmAnal | 1 Comment

LRCM reliability analyst survey results

Mesh LRCM has two principal objectives. First, to ensure analyzable work order data, and second, to update the RCM knowledge base whenever it deviates from reality as observed by the technician. On a scale of one to 10, six maintenance … Continue reading

Posted in Data and samples, EAM, LRCM, Reliability Analysis | Tagged , , | Leave a comment

Mesh: 12 steps to achieving reliability from data

Mesh is a Living RCM (LRCM) knowledge management system. It interfaces with the EAM in order to achieve two principal objectives: Ensure systematic knowledge update whenever a technician encounters divergence between the RCM analysis and an observed failure behavior, and, … Continue reading

Posted in CBM, Data and samples, EAM, LRCM, Managing LRCM, Reliability Analysis | Tagged , , | 1 Comment

ACIEM conference paper on LRCM

Posted in Case studies, EAM, LRCM | Tagged , | Leave a comment