Category Archives: CBM

Condition based maintenance

NAVAIR and the PF interval

This slide presentation provides some facts on the P-F interval. It concludes with a common misconception about the P-F graph.

Posted in P-F Interval | Tagged , | Leave a comment

Internal and external CBM variables

As maintenance or reliability engineers we need to discover what factors influence failure and failure probability. Which of those factors can we control, and which can we monitor for their predictive content. It will help to distinguish between External and … Continue reading

Posted in CBM | Tagged | 1 Comment

The elusive P-F interval

This article discusses the P-F Interval for CBM decision making, its areas of usefulness, and those areas where it is inadequate as a predictive maintenance strategy. An alternative more general approach based on the EXAKT system is proposed. Two categories … Continue reading

Posted in P-F Interval | Tagged , , , , , | 3 Comments

CBM Exercises

The exercise included on this page uses EXAKT CBM modeling software. EXAKT is an advanced Living RCM Certified® reliability analysis system that predicts a component’s remaining useful life based on its age and current condition. A maintenance department achieves continuous … Continue reading

Posted in Exercises | Tagged , , , | 4 Comments

P-F Interval a red herring?

The article describing EXAKT CBM optimization, “The Elusive P-F Interval“, may leave one with the impression that the P-F Interval is an irrelevant concept. The P-F Interval is a useful concept in certain simple cases. Nevertheless, it does detract from an … Continue reading

Posted in P-F Interval | Tagged , | Leave a comment