Author Archives: Murray Wiseman

The elusive P-F interval

This article discusses the P-F Interval for CBM decision making, its areas of usefulness, and those areas where it is inadequate as a predictive maintenance strategy. An alternative more general approach based on the EXAKT system is proposed. Two categories … Continue reading

Posted in P-F Interval | Tagged , , , , , | 3 Comments

CBM Exercises

The exercise included on this page uses EXAKT CBM modeling software. EXAKT is an advanced Living RCM Certified® reliability analysis system that predicts a component’s remaining useful life based on its age and current condition. A maintenance department achieves continuous … Continue reading

Posted in Exercises | Tagged , , , | 4 Comments

Structured free text

Data or reliability analysis is the main role of the Reliability Engineer (RE) in maintenance. In support of his quest for good data, the RE should organize and teach technicians, planners and supervisors how to complete maintenance work orders so … Continue reading

Posted in Managing LRCM | Tagged , , , , , , , , , | Leave a comment

Time to failure

This slide presentation describes the basics of the age reliability relationship. It clarifies the difference between the Failure Rate function and the Conditional Probability of Failure. An amusing story about confusing Failure Rate and Conditional Failure Probability is told in … Continue reading

Posted in Theory and definitions | Tagged | 2 Comments

LRCM at Cerrejon

Without an adequate data sample there can be no reliability analysis (RA). Without analysis there can be no systematic, verifiable improvement in reliability nor in operational economy. A sample is a collection of life cycles. A beginning and ending event … Continue reading

Posted in Case studies | Tagged , | Leave a comment