No inspections

Tagged: 

Viewing 2 posts - 1 through 2 (of 2 total)
  • Author
    Posts
  • #1523

    How does EXAKT treat life cycles that have no inspections?

    #1540
    Daming Lin
    Member

    EXAKT includes the life cycles without inspections in building the PHM. However, the model built with too many such life cycles will not be reliable. Anyway, it is always a good pratice to keep the full information including events and inspections in each life cycle.

Viewing 2 posts - 1 through 2 (of 2 total)
  • You must be logged in to reply to this topic.